When adding AFDDs, the software should know when they take two board ways.
An AFDD takes two ways. Therefore if in 1L1, 1L2 cannot be allocated to a circuit. The software should know this and should blank the way out. On the left of a TP board it is the following way that becomes unusable (as above) but on the right of a...
Find and Replace for Components and Cable Identifiers
We build a number of standard/package plant systems. All identical other than client specific numbering on components and cables. Current set up means you have to open every item to rename, can there not be a find and replace function?
Have standard microsoft colour palettes available for boxes/text etc. Option to have full colour spectrum (as is current) can be retained but over complicated for most applications and a pain to then match colours or reset to standard (black/white...
Be able to add final circuits or transformers with two phase loads. Control transformers in switchgear/plant rooms will often use two phase 400Vac supply.
Installations may have circuits that are not being altered/changed as part of the works but circuits will be drawn to allow loads to be properly calculated. Having a setting to stop these cables being generated in reports would be helpful rather t...
When inserting a Final Circuit have the ability to move junction boxes to a desired position rather than automatic spacing. Alternatively allow final circuits to be connected to Junction Boxes
6.6kV rating applied to Merlin Gerin MV Ringmaster Range .
In Electricity North Wests area they have primary substation network operating at 6.6kV and a fault level of 250MVA. The Ringmaster range is rated to 21.9KA therefore compatible but it returns an error code for the Pscc exceeding fault capacity as...